Building 401

Fort Collins, Colorado

This $14.6-million project consists of a 33,623 SF build-out of the shelled 4th and 4M (interstitial) floors within the laboratory.  These floors replicate the 3rd and 3M floors of the buildings, which include Level 2 and Level 3 Bio-Safety Laboratories and laboratory support offices.  Equipment associated with this project includes a new incinerator and rooftop exhaust fans.  Additions and modifications to the building’s Building Automation System (BAS), electrical power monitoring, fire alarm, and sprinkler systems were also included as part of this project.

Area: 33,623

Total Construction Cost: $14.6 Million

 
 